THE BATHROOM

This is a house that was growing thru generation. The first original building didn't have a bathroom. Later on, a small extension was built and there was created a reception area with entrance to the main building and to the new toilet. Later on, the building grows one more time and a kitchen was added to this same area which allowed the toilet to grow and become, still very small, but a bathroom.  Finally, in this house, there were 2 bathrooms but the first one was unused for the last 10 or more years.

A new approach to this task allowed me to redefine this area. I divided the bathroom and created a new bathroom and a utility room. The existing entrance serviced the utility room while the new bathroom gets a door from more heat protected, deeper part of the house.

An existing pilaster received contrasting tiles creating a featured element that reminds the past of this part of the house.

PROPOSAL

PROPOSAL

Design done in 3d software because of complex shape of the existing room and to ensure the best usage of the space. There were used BIM models of sanitaryware. At the stage of creating the project color scheam wasn't choosen and tails are idicative showing the featured pilaster tailing.

ON SITE

ON SITE

ON SITE

ON SITE

ON SITE

ON SITE

The existing toilet was longer. I proposed to devide the room and create a smaller more functional bathroom and a utility room.

ON SITE

ON SITE

At the picture it can be seen a existing featured pilaster.

FINAL RESULT

FINAL RESULT

Using a glazed shover screen vitgh sliding doors alloved to optically enlarged the space and make the best use of it.

SOFT LIGHT SOLUTION

SOFT LIGHT SOLUTION

Bespok light solution.

DETAIL

DETAIL

Featured pilater tailing and sliding shover screen details

3

3

The gully runs for whole width of shower. The treshold along the fall in the shower made of aluminum rectangular section.

BATHROOM

BATHROOM

BATHROOM

BATHROOM

FINAL
CONCEPT & ON SITE